Indicative Timeline

Site Preparing & Groundworks | Complete

  • Site cleared of any existing structures or vegetation

Framing Installation | Complete

  • Strong and durable frames made from high-quality materials

  • Specially designed for specific climate and weather conditions at the site

  • Expert technicians use specialised equipment to drive the frames into the ground

  • This process ensures suitability and longevity of the solar farm

Cabling & Trenching | Complete

  • Trenches are carefully planned and marked out

  • Digging is carried out using specialised machinery to minimise damage to the surrounding environment

  • Cables are laid out in the trenches and protected using conduit or other protective materials

  • Trenches are then backfilled and compacted to protect the cables

Panel Assembly | Complete

  • Solar panels are placed onto the frames and securely fastened

  • Panels are position to ensure optimal exposure to the sun

  • Technicians ensure proper spacing and alignment between the panels and frames

  • Final checks are performed to ensure panels are functioning properly and securely mounted

Electrical Component Foundation Preparation and Installation | Complete

  • Preparation: Clearing of site, excavation, compacting of soil

  • Installation: Mounting of pre-fabricated components and assembly of an on-site built components

Security Installation | Complete

  • Installation of security fence around the solar farm boundary (March - May 2023)

  • Placement of CCTV cameras to monitor fence line and interior of site (July - August 2023)

High Voltage Works | Ongoing

  • Carried out by licensed electrical engineers

  • Necessary for solar farm to generate and transmit electricity

Commissioning | Ongoing

  • Final testing of solar farm equipment and systems

  • Connection of solar farm to the electrical grid

Construction Decommissioning & Civil Works | Ongoing

  • Removing construction equipment from site

  • Restoration of site and road system to original state (within a month of construction completion)

Landscaping (According to Planting Season) | Ongoing

  • Seeding and planting of site and boundaries

  • Implementation of a custom planting plan